The commissioning of the ALBA Storage Ring started on Tuesday 8th of March 2011 at 14:00h. Within one day the beam made few turns around the machine, and on the 13th of March, after switching on the RF, the beam was stored.
View post:
ALBA storage ring reaches 100 mA
If you enjoyed this post, make sure you subscribe to my RSS feed!